After learning that the lake was beginning its annual drain/flood,
collecting as much data as possible was critical. Only one hole had been
drilled, not completely to the glacier bed, and it did not yet have a
pressure transducer placed in it to gather water level data (we were
expecting to put in at least seven holes complete with pressure transducers
gathering data). Surveyor Dennis Trabant had just completed placing his
survey stakes yesterday, but had not yet started collecting survey data to
record the changes in the surface of the glacier as the lake drained. In
addition, there was concern that the drill site was in an area that would go
through significant topographic changes (opening of crevasses, debris
slides, shaking) as the lake drained. Joel Harper (drill operator) was
extremely worried that his drilling equipment was going to be swallowed by
the glacier. Last night was quite a night. It was as if a train was
leaving and only half the luggage was packed.
Surveyor Dennis Trabant (USGS, Fairbanks) proceeded to set up his survey
site, and surveyed the position of the reflectors he had set on the ice dam.
He left camp at 10:00 PM (after already working 10 hours during the day)
and surveyed until 1:30 AM. Joel Harper (University of Wyoming), Andrew
Malm (St. Olaf undergrad), and myself left camp at 10:00 PM and hiked back
out to the drill site. We broke down the equipment and got it ready for an
emergency air lift the following morning. Don Lindsay (PSU grad student)
stayed back at camp to wire a pressure transducer. He hiked out to the
drill site at 11:00 PM to lower the transducer into the one hole that had
been drilled. We got to the drill site at 11:30 PM. Don arrived at about
midnight and set the pressure transducer into the hole. We worked by
twilight until 2:15 AM. As we started back, the sunrise for the next day
was commencing. We got back to camp by 3:15 AM. We were exhausted. I
collapsed into my sleeping bag inside my tent and fell asleep instantly.
However, by 7:30 AM the drenching sunlight which typifies high latitude
summers was turning the inside of my tent into a greenhouse. The muggy
climate drove me from my sleep.
This morning , the lake team (Joe Walder and Michelle Cunico) reported that
the lake level had dropped another 10 feet overnight. There was no longer
any doubt that the lake was draining. A call was made get a helicopter as
soon as possible to shuttle out the drilling equipment. We heard back that
the helicopter would be heading our way at 10:00 AM, if the fog that
shrouded Valdez, where the helicopter was based, had cleared. Driller Joel
Harper, PI Andrew Fountain, grad student Don Lindsay, seismologist Steve
Malone, ice radar specialist Andrew Malm, and myself waited in camp. At
10:00 AM we got word that the helicopter was still socked in at Valdez. A
loud boom came from the direction of the lake - calving and collapse of ice.
Joel was nervous about getting his drilling equipment off of the ice.
Four of us would be going to the glacier to prepare the sling loads - PI
Andrew Fountain, Joel Harper, Don Lindsay and myself. There was still a
seismometer and seismograph at the drilling site collecting data. I would
be breaking down and packing up that equipment. Andrew Fountain was also
going to check the pressure transducer that Don had placedinto the hole the
previous night. At 12:30 PM we were told that the helicopter had left
Valdez and would be arriving at our camp at about 1:30 PM.
Loading the slings went smoothly on the glacier. By 3:30 PM the drilling
and seismic equipment was off of the ice. We all breathed a sigh of relief.
_______________________________________________________________
Get Free Email and Do More On The Web. Visit http://www.msn.com
Contact the TEA in the field at
.
If you cannot connect through your browser, copy the
TEA's e-mail address in the "To:" line of
your favorite e-mail package.
|